Independent notes for ecological growersResearch edition September 2026
← All reading pathsField path 02 / Irrigation & tunnels

Water with a working record

Separate system design, actual delivery and crop need. Follow this path before turning an unexplained dry patch into a longer irrigation schedule.

Follow 5 connected guides ↓
Greenhouse with raised side openings and an open roof vent.
A greenhouse using side openings and a ridge vent, from UVM Extension’s ventilation guide. UVM Extension Agricultural Engineering; individual photographer not identified · Image source
Take it back to the farm

Keep the context with the action.

Use the water worksheet only after choosing an explicit area, depth and measured flow. It calculates volume and time; it does not prescribe crop demand.

Open the water-volume worksheet ↗